Case studies.
Every project here is real work MSR delivered — not a stock template. More case studies are being added as they're written; see the full list in the build spec.
Tunnelling & Civils
HS2 Tunnelling Steelwork
Portal and shaft steelwork fabricated and delivered to HS2's tunnelling programme, sequenced around a live TBM drive where getting the timing wrong risks stopping the tunnel.
Rail
Hunt's Cross Station Steelwork
MSR fabricated and fitted footbridge, lift tower, staircase and canopy steelwork into Hunt's Cross's Grade II listed City Line station without disturbing its heritage fabric.
Architectural & Hospitality
Architectural Metalwork, Liverpool
Rooftop balustrades on the Liverpool waterfront, perforated feature screens, and laser-cut bar fronts for Eric's and BOHO — MSR's finish work, not just structure.
Tunnelling & Civils
Tunnelling & Shaft Steelwork, Merseyside
MSR has fabricated shaft linings, walings, propping and gantries for UK tunnelling contractors for decades, a continuing programme rooted in the MEPAS scheme.
Rail
Meols Station, Wirral — Accessibility Footbridge
Step-free footbridge and twin lift towers, prefabricated in Bootle and craned into place during night possessions on a live Merseyrail line.
Commercial Construction
Moreton Hills Golf Range
MSR designed, fabricated and erected the full canopy structure for Moreton Hills Golf Range's driving-range bays, from Bootle fabrication to on-site crane erection.
Tell us what you need fabricated.
Structural, architectural or tunnelling steelwork — send drawings or a rough spec and we’ll come back with a straight answer.